Ramada Suites - Queenstown
LARGE PROJECT COMPLETE
After 3 months work the Ramada Suites is now complete.
This project required a co-ordinated approach from Glass and Window Solutions. Frontline commercial aluminium joinery was used throughout the building – 150mm on the ground floor and 100mm on all the other floors. Clear double glazing was used throughout.
Our crew of installers worked full-time for 3 months. Taking weekly deliveries of the Frontline aluminium joinery that had been manufactured in our Christchurch operation.
Enquiry
Related products
-
Black Cat Apartment balustrades completed
The Unex balustrades on the Black Cat Apartments have just been completed.
The balustrades look fantastic. We implemented Decor Glazed at the balustrade ends with Extreme X1500 Privacy Screens down the side. The use of Etchlite Obscure Glass offers tenants further privacy.
-
St Martins Village Green apartments Christchurch
Approx. 200 metres of powder coated aluminium balustrade was installed for Christchurch’s newest greenspace apartment complex.
The project went extremely well and we’re proud to announce we’ve been awarded the work for the next stage.
-
Wigram Medical Centre – Christchurch
The Medical Centre in Wigram was recently completed.
This project required a combination of both Commercial and Frontline aluminium windows and doors.
-
Salisbury Apartments Renovation – Christchurch
The Salisbury Apartments were to be renovated in preparation for selling.
Project included retro fitting double glazed windows, frameless glass showers and mirrors for each of the apartments.